Place of work: Ivankiv village, Vyshhorod district, Kyiv region.Owner/user of land: Ivanovo village council.Period of work: 13.03-29.05.2024.Volume, ha: 1049.9.The group that carried out the work: NTS No. 1 (headed by Dmytro Garbuzov) and NTS No. 3 (headed by Yuri Bogdan).
NTS result: Plot 1. The remnant of the Grad MLRS; a fragment of a Grad MLRS shot; Crater.Section 3. Explosion crater; abandoned military positions (trenches); funnel 3 units; tail section of the Grad MLRS; Ulamov missiles Kh101.Plot 4. Crater from the explosion of the Kh101 missile (diameter 10 m, depth 1 m); remains of the Kh101 missile; explosion crater; remnants of rackets X101.Plot 5. Crater from the explosion of TM; 122 mm cartridge cases; craters; remnants of the capping.Section 6. sign "Mine Guard"; Fragment of the tail stabilizer against an anti-tank shot; a fragment of an artillery shot; a fragment of a PG-7 anti-tank cumulative rocket-propelled grenade; a fragment of a standard cap from sniper cartridges; metal shard; fragment of a cumulative anti-tank round (2 units); the fragment looks like a fuse from an artillery shell; a fragment of the UDZ fuse for GRN and RGO grenades; fragment of an artillery shot (3 units); a fragment of the tail stabilizer from an anti-tank shot; funnel (7 units); fragment of the tail stabilizer of the MLRS.Section 7. Funnel (17 units). Section 9. A fragment of the destroyed Uragan MLRS (2 units); a crater from the destruction of the Uragan MLRS; cluster warhead of the Uragan MLRS; a fragment of the destroyed Uragan MLRS (3 units); crater from the destruction of the Uragan MLRS.Plot 10. Funnel (3 units). Section 11. The remnant of the Grad rocket.Plot 12. In the immediate vicinity of the site there are enemy combat positions; "Mine Danger" sign; Funnel.
"The peculiarity of the implementation of this project was its large area (more than 1000 hectares), the separation of plots and their location in the hard-to-reach swampy area of the Kyiv region. It is thanks to the well-coordinated work and cooperation of the two groups of non-technical inspection that it was possible to effectively perform a significant amount of work in a fairly short time, "said the head of the NTS group No. 3 Yuri Bogdan.
The work was carried out in accordance with orders No. 185 dated 11.03.2024, No. 337 dated 11.04.2024 and No. 464 dated 06.05.2024.